A wooden 18th-century church is being restored in Lviv region (photos)
As the official website of the Lviv Oblast Military Administration reports, its Department of Architecture and Urban Development has received permission from the Ministry of Culture and Information Policy of Ukraine to carry out restoration work on the wooden Cathedral of the Blessed Virgin Mary in the village of Zabolottsi, Zolochiv district.

Restoration of the church. Photo: Lviv Oblast Military Administration
Last week the contractor, the “Creative Factory Viktoriia”, began the work. The technical specification provides for various kinds of work, including:
– restoration of the wooden structures of the eaves and the roof of the sacristy;
– installation of oak sills for the porch;
– reconstruction of the roofing of the domes over the nave and the babinets (women’s section);
– replacement of unusable parts of the log walls;
– fire-retardant treatment of the wooden structures;
– bio- and fire-retardant treatment of the shingles; – insecticide treatment of the timber;
– installation of lightning protection.
The church is an architectural monument of national significance, and its construction dates from 1746.
The church was built on the site of an older one burned by the Tatars. The church’s patron (ktytor) was Seweryn Rewucki, and the parish priest at the time was Gabriel Szczesnicki.
In 1961 (according to other sources, in 1964) the church was closed for services under Father Petro Kostiuk, and the faithful went to the churches of the neighbouring villages of Luhove and Ponykovytsia. When the church was closed, a number of church relics were removed, including a unique handwritten 13th-century Gospel. The church was returned to the faithful only in 1989.
Restoration of the church. Photo: Lviv Oblast Military Administration
Restoration of the church. Photo: Lviv Oblast Military Administration

Restoration of the church. Photo: Lviv Oblast Military Administration
In 2015 the church was surveyed and a decision was made to begin urgent anti-collapse work to halt its deterioration. During 2015–2016, urgent restoration work was carried out with funds from the oblast budget: in particular, the dilapidated sills around the entire perimeter of the building were replaced, the dome over the altar part of the church was restored and covered with shingles, and the most dilapidated load-bearing wall was reinforced.


